Integrated simulation and optimisation of scheduling yard crane and yard truck in loading operation Online publication date: Mon, 11-May-2020
by Pengliang Cao; Guiyan Jiang; Senjia Huang; Lingqi Ma
International Journal of Shipping and Transport Logistics (IJSTL), Vol. 12, No. 3, 2020
Abstract: To further decrease turnaround time of container vessels, synchronous scheduling of yard crane (YC) and yard truck (YT) with the impact of quay crane (QC) is mainly considered. On this basis, the interference between YCs, YT pool strategy and other practical constraints, are also taken into consideration. Firstly, this problem formulated as a mixed integer programming model to minimise the makespan of loading operation. Due to the computational intractability, the multi-layers genetic algorithm is introduced to solve the problem with a simulation model, then an improved algorithm and an algorithm accelerating strategy are also designed to further improve the optimising efficiency. Finally, two sets of experiments with over 300 tests are conducted by eight elastic compute services on Alibaba Cloud to validate necessity of considering the impact of QC and the solution quality and effectiveness of the proposed methods.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Shipping and Transport Logistics (IJSTL):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com