Bus manufacturing workshop scheduling method with routing buffer Online publication date: Fri, 15-May-2020
by Zhonghua Han; Jingyuan Zhang; Shiyao Wang; Yuanwei Qi
International Journal of Simulation and Process Modelling (IJSPM), Vol. 15, No. 3, 2020
Abstract: Aiming at solving the problem that the moving route is complicated and the scheduling is difficult in the routing buffer of the bus in the manufacturing workshop, a routing buffer mathematical programming model for bus manufacturing workshop is proposed. We design a moving approach for minimising the total setup cost for moving in routing buffer. The framework and the solution of the optimisation problem of such a bus manufacturing workshop scheduling with routing buffer are presented. The evaluation results show that, compared with the irregularly guided moving method, the proposed method can provide a better guide line for the bus movement in the routing buffer by reducing the total setup time of all buses processed at the next stage, and a better scheduling optimisation solution with minimise maximum total completion time.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Simulation and Process Modelling (IJSPM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com