The effect of purchasing strategy on the economic production quantity model subject to random machine breakdown Online publication date: Fri, 14-May-2021
by Mehdi Deiranlou; Farzad Dehghanian; Mohammadali Pirayesh
International Journal of Procurement Management (IJPM), Vol. 14, No. 3, 2021
Abstract: In this article, we develop an economic production quantity (EPQ) model subject to process deterioration, machine breakdown and two types of repair, and study the influence of purchasing strategy on the system's expected total cost, as an alternative option to holding safety stock. It is obvious that the shortages may occur due to the prolonged repair time. To avoid this issue, we assume that the manufacturer could purchase some quantities from an available supplier with fixed non-zero lead-time. This paper addresses the following question: how much production lot size and purchasing lot size are required to minimise the expected total cost? The model is developed under general machine breakdown and repairs time distributions. The optimality of the model under exponential failure and exponential repair times are studied. For the numerical example, we illustrate the outcome of the proposed model and perform a sensitivity analysis on parameters, which directly influence optimal decisions.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Procurement Management (IJPM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com