Modelling randomness of a manual assembly system with walking workers Online publication date: Mon, 01-Jan-2007
by Qian Wang, Ling Pan, Antony Roy Mileham, Geraint Wyn Owen, Linda Blyth Newnes, Christopher Reginald Chatwin
International Journal of Industrial and Systems Engineering (IJISE), Vol. 2, No. 2, 2007
Abstract: Most proposed approaches for modelling and simulation of an assembly production line have focused on conventional assembly lines where one (or more) stationary worker stays at a given station to complete a repetitive assembly operation and when this operation is accomplished, the assembled part is transferred to another worker at the next station for the next assembly operation. This paper presents an investigation of a linear walking worker assembly line where one worker walks along the line to complete the assembly of a product from start to finish. The study was carried out based on a real job shop environment with a demand-pull production control system. The randomness of walking worker activities was modelled using a proprietary simulation package. The paper discusses several issues which may assist in the early stages of designing a linear walking worker line.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com