Multi-objective inventory model for material requirements planning with uncertain lead-time Online publication date: Fri, 13-May-2022
by Heibatolah Sadeghi; Anwar Mahmoodi
International Journal of Operational Research (IJOR), Vol. 43, No. 4, 2022
Abstract: Material requirements planning (MRP), in its original form, utilises deterministic lead-time. However, the lead-time uncertainty is a fact of life in most of production systems. Therefore, developing MRP to deal with lead-time uncertainty is of great importance to academics and practitioners. In this paper, the problem of supply planning is considered in a multi-period, multi-level assembly system in which each sub-level has several components whose lead-times are uncertain. A two-objective mathematical model is presented not only to provide the appropriate number of periods in POQ policy, but also to determine the planning lead-time of each sub-level component. The aim of the model is to minimise the expected total cost, and to maximise the customer service level. Furthermore, two metaheuristic algorithms, namely non-dominated sorting genetic algorithm-II (NSGA-II), and multi-objective particle swarm optimisation (MOPSO) are proposed to solve the model. Finally, numerical experiments are carried out to compare the effectiveness of the procedures.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Operational Research (IJOR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com