An EPQ model with Weibull deterioration considering warm-up period and two backordering costs Online publication date: Wed, 07-Feb-2024
by Mohanraj Subramanian; Uthayakumar Ramasamy
International Journal of Operational Research (IJOR), Vol. 49, No. 2, 2024
Abstract: The main aim of an organisation is to fulfill customers demand by reducing the costs involved. In this paper we propose an economic production quantity model having four levels of production. The first and second levels of production include warm-up period and corrective maintenance period respectively. The third and fourth levels of production are regular production processes. The deterioration rate follows Weibull distribution with two parameters. Partial backordering is considered as linear and backordering cost as fixed. Total cost of production is depending upon production rate, demand rate, rate of deteriorative items and partial backordering. The primary objective is to find an optimal solution for production time which minimises the total cost by considering warm-up period and partial backordering. Finally, the numerical example and sensitivity analysis on parameters are given to validate the results of proposed model.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Operational Research (IJOR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com