Risk assessment method of construction project based on grey correlation analysis
by Lianguang Mo; Yu Liu
International Journal of Sustainable Development (IJSD), Vol. 27, No. 1/2, 2024

Abstract: Given the problems of large evaluation errors and long time-consuming in the existing methods, a risk evaluation method for construction projects based on grey correlation analysis is designed. First, build the evaluation index system, and divide the index grade to achieve the construction of the index system. Then, a fuzzy matrix is constructed to determine the complementary relationship between different indicators, and the indicators are quantified and verified for consistency. Finally, determine the index time series dataset, eliminate the index difference, and determine the index difference sequence, maximum range and minimum range value. The index correlation coefficient is calculated and sorted, and the improved grey correlation analysis algorithm is introduced to build the evaluation model. The test results show that the proposed method can reduce the evaluation error and has a certain application value.

Online publication date: Thu, 08-Feb-2024

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Sustainable Development (IJSD):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com