Integrating non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line with stochastic dependence Online publication date: Thu, 04-Jul-2024
by Ziyad Bahou; Issam Krimi; Abdessamad Ait El Cadi; Nizar El Hachemi
International Journal of Industrial and Systems Engineering (IJISE), Vol. 47, No. 3, 2024
Abstract: This paper investigates the integrated non-cyclical preventive maintenance scheduling and production planning for a series-parallel production line. We consider the stochastic dependence between the components of each subsystem. This problem has not been studied so far in the literature even though it represents a realistic configuration. First, we compute the available production capacity restricted by the stochastic dependence. Then, an integer linear program is used to determine the optimal production plan and preventive maintenance schedule. The results show that ignoring the stochastic dependence effect causes many unexpected consequences and additional production and maintenance costs. This work provides practitioners with a set of managerial insights to develop adequate integrated production and maintenance policies.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com