Optimisation of the control policy for a stochastic remanufacturing system with an unreliable replacement parts supply
by Francois Berthaut, Robert Pellerin, Ali Gharbi
International Journal of Simulation and Process Modelling (IJSPM), Vol. 5, No. 3, 2009

Abstract: We consider the control of a stochastic manufacturing system executing capital assets repair and remanufacturing in a closed-loop system. A simple suboptimal control policy in class of multi-hedging point policy is proposed. This policy consists of inventory thresholds related to different predefined repair and replacement modes, depending on the replacement parts availability. This paper focuses on estimating the optimum control policy parameters in terms of total cost by means of simulation tools. A flexible combined discrete event and continuous modelling is introduced and simulation experiments are conducted for a numerical example to achieve a close approximation of the optimal policy.

Online publication date: Wed, 20-Jan-2010

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Simulation and Process Modelling (IJSPM):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com