Power Factor correction capacitors for utilising power consumption in industrial plants Online publication date: Fri, 07-May-2010
by Osama M. Aloquili, Nazih M. Abu-Shikhah
International Journal of Energy Technology and Policy (IJETP), Vol. 7, No. 3, 2010
Abstract: Installation of capacitor banks proved to be cost effective approach to correct power factor in industrial plants. Optimum capacitance value that contributes to the maximum PF improvement varies from one system to another. Such value depends on the existing electrical system within the industrial plant. This paper provides industrial plants operators an optimisation model to correct and improve PF. This paper is supported by using both MATLAB programming and iteration loop technique. The Jordanian Petroleum Refinery Company is taken as a case study. Results indicate that PF improvement reached almost unity PF for this case, which yields to a reduction in the overall electricity bill.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Energy Technology and Policy (IJETP):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com