Hybrid genetic algorithm for SDST flow shop scheduling with due dates: a case study Online publication date: Fri, 28-Jan-2011
by Ashwani Dhingra, Pankaj Chandna
International Journal of Advanced Operations Management (IJAOM), Vol. 2, No. 3/4, 2010
Abstract: Sequence dependent setup times (SDSTs) flow shop scheduling problems with due date related performance measures have been increasing attention from managers and researchers. Most of flow shop scheduling problems is NP hard and various heuristics and metaheuristics have been developed for finding solutions in a very reasonable time. In this work, the authors have proposed hybrid genetic algorithm (HGA) for SDST flow shop scheduling problems using strong computational power of matrix laboratory (MATLAB) and robustness of metaheuristics. Four modified NEH-based HGA have been developed and their performance has been compared with the help of a defined index for medium to large size problems. The objective function considered is minimisation of total weighted squared tardiness with due dates and weighting coefficient attached to each job. Comparison shows that the modified NEH4-based HGA performs better for medium to large size problems. The work has been supported by the computational results and application to the cold rolling division of a steel industry.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Advanced Operations Management (IJAOM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com