Buffer size determination for drum-buffer-rope controlled supply chain networks Online publication date: Thu, 31-Jul-2014
by Zhaleh Parsaei; Nasim Nahavandi; Tarek ElMekkawy
International Journal of Agile Systems and Management (IJASM), Vol. 5, No. 2, 2012
Abstract: The theory of constraints drum-buffer-rope (DBR) system is a method for achieving effective supply chain management (SCM) and is now being implemented by a growing number of companies. Buffer size determination is the most difficult step in using DBR in SCM, however, it received less attention and the buffer level is usually determined by trial and error. The focus of this paper is first is to develop an efficient approach to determine the sizes of time buffers of control points of the DBR controlled supply chain. The approach is constructed according to the supplier network reliability analysis in the control points of networks; second, the proposed approach is compared with the most common approach in literature by means of a simulation study using enterprise dynamics (ED). Simulation results show that the developed approach is more effective than the most common approaches in literature.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Agile Systems and Management (IJASM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com