Tower crane selection for an industrial project: case study
by P. Valli; C. Antony Jeyasehar; R. Dhanaraj
International Journal of Engineering Management and Economics (IJEME), Vol. 4, No. 1, 2013

Abstract: This paper aims at illustrating the uses of tower crane as important equipment for a high-structured commercial complex. The decision to use a tower crane is relatively easy one since the determining conditions are simple. The use of tower cranes required thorough planning because of their structures, foundations and presence. The application of type, size and number should also be considered. The characteristics of various types available must be considered against the requirements imposed by the loads to be handled and the site conditions. Weights, dimensions and lift radius of the heaviest and largest loads must also taken into consideration for the utility of tower cranes.

Online publication date: Fri, 23-Aug-2013

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Engineering Management and Economics (IJEME):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com