Project time and cost estimate at completion based on non-parametric resampling with interval risk
by Afshin Kamyabniya; Seyed Mohammad Seyedhoseini; Saied Yaghoubi
International Journal of Industrial and Systems Engineering (IJISE), Vol. 21, No. 4, 2015

Abstract: Control and feedback in complex and sensitive systems with different resources and properties in uncertainty conditions are one of the significant challenges for project managers. Therefore, in this paper, an integrated model with quantitative and qualitative approach based on earned value management and risk analysis methods proposed to decrease deviations in time and cost estimation at complete (EAC(t) and EAC). Using the proposed performance indexes based on risk scores obtained by non-parametric resampling technique, namely bootstrap, calculating more accurate estimations of final cost and duration at lower and upper band with various confidence levels will be possible. Finally, an illustrative case study presented demonstrating the proposed model can be efficiently applied through real case software projects.

Online publication date: Wed, 28-Oct-2015

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com