Externally fired biomass gasification-based combined cycle plant: exergo-economic analysis
by P. Mondal; S. Ghosh
International Journal of Exergy (IJEX), Vol. 20, No. 4, 2016

Abstract: This paper reports an exergo-economic evaluation of an externally fired biomass gasification-based plant. Effects of major design and operating parameters: pressure ratio (rp), gas turbine inlet temperature (TIT) and cold end temperature difference (CETD) of the heat exchanger (HX), on the plant performance are reported. Parametric optimisation has also been attempted. The study reveals that, higher rp and lower TIT result in higher unit product cost of the plant. Also unit product cost decreases with increase in CETD of the HX. It is further observed that levelised unit cost of electricity is minimised at a particular combination of the parameters.

Online publication date: Tue, 02-Aug-2016

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Exergy (IJEX):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com