Lost-sales reduction on coordinated vendor-buyer models of a two-stage supply chain with stochastic supply lead-time Online publication date: Mon, 17-Jul-2017
by Hsien-Jen Lin
International Journal of Industrial and Systems Engineering (IJISE), Vol. 26, No. 4, 2017
Abstract: This paper is concerned with the problem of lost sales reduction in an integrated vendor-buyer supply chain model with stochastic lead time. We consider that lost sales rate can be reduced through further investment. By framing the model, we observe that a significant amount of savings can be achieved to increase the competitive edge. The objective is to derive the optimal production and shipment policy, and the optimal investment strategy in reducing lost sales for the integrated vendor-buyer system with partial backordering under stochastic lead time. A computer code using the software Mathematica 7 is developed to derive the optimal solution. Furthermore, the effects of the parameters associated with the model are also studied. Finally, we provide numerical examples to illustrate the results.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com