An environmental and economic evaluation of the lignite power generation system by using the life cycle analysis principles Online publication date: Wed, 11-Oct-2017
by Dimitrios-Sotirios Kourkoumpas; Georgios Stamatiou; Sotirios Karellas; Panagiotis Grammelis; Emmanuel Kakaras
International Journal of Global Warming (IJGW), Vol. 13, No. 3/4, 2017
Abstract: The present study aims to evaluate the power generation system based on the lignite fuel in environmental and economic terms. Three alternative firing cases are examined: 1) raw lignite firing; 2) 30% pre-dried lignite co-firing; 3) 6% biomass co-firing case. The implementation of the life cycle analysis (LCA) methodology proves that the overall environmental footprint can be decreased by as much as 4.5% in the case of pre-dried lignite co-firing, while the lignite mining activities represent about 32% of the total. The implementation of the life cycle costing (LCC) methodology indicates that the total electricity generation cost is decreased by about 0.92 /MWhe in the case of pre-dried lignite co-firing and about 1.22 /MWhe in the case of biomass co-firing. A sensitivity analysis based on the total net electric efficiency, the raw lignite composition, the CAPEX-OPEX of the power plant, the biomass direct fuel cost and the external cost of CO2 was carried out, in order to identify the range of the results depending on the impact of each parameter.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Global Warming (IJGW):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com