A mathematical model for scheduling of production process and allocation of an automatic guided vehicle in a flexible manufacturing system Online publication date: Mon, 21-May-2018
by Mohammad Mehdi Tavakoli; Hasan Haleh; Mohsen Mohammadi
International Journal of Engineering Systems Modelling and Simulation (IJESMS), Vol. 10, No. 2, 2018
Abstract: Given that material handling in manufacturing systems is very important, many organisations use automatic guided vehicle (AGV). In recent years, many organisations have intended to have access to an optimal scheduling plan for their manufacturing and transportation system. For this reason, a mathematical model is proposed in this study for scheduling of the production process and AGV's allocation. Production time in any process, setup time, loaded/unloaded trip duration, parking spaces, and the discharge time and loading of products at each workstation are considered in the proposed model. Finally, a numerical example is used to explore the proposed model and it will be solved using GAMS software.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Engineering Systems Modelling and Simulation (IJESMS):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com