Production inventory model with reworking of imperfect items and integrates cost reduction delivery policy Online publication date: Fri, 29-Jun-2018
by M. Sanjai; S. Periyasamy
International Journal of Operational Research (IJOR), Vol. 32, No. 3, 2018
Abstract: The classical EPQ model assumes that all items manufactured are of perfect quality. However, in real life production systems, due to various controllable and/or uncontrollable factors, the generation of defective items during a production run seems to be inevitable they should be reworked. A portion of non-conforming items produced is considered to be scrap, while the rest reworked in each cycle. This paper integrates cost reduction delivery policy into production inventory model with defective items with scrap and rework and finished items can only be delivered to customers at a fixed interval of time during production downtime with the purpose of reducing holding cost. A suitable mathematical model is developed and the optimal production lot size which minimises the total cost is derived. An illustrative example is provided and numerically verified. The validation of result in this model was coded in Microsoft Visual Basic 6.0.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Operational Research (IJOR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com