Analysis of the impact of the increase of production volume on the material supply system and work in process through simulation scenarios Online publication date: Tue, 24-Jul-2018
by Jacob Ortega Gómez; José Alfredo Jiménez García; Andrea Verónica Balderas Arriaga; Armando Javier Ríos Lira
International Journal of Supply Chain and Operations Resilience (IJSCOR), Vol. 3, No. 3, 2018
Abstract: In this work, we present a detailed analysis of the improvements that are required when a company needs to increase its production capacity. For this a computer simulation model of the current situation of the company was developed, which will be called KS, where 430,000 pieces are currently produced for the general motors (GM) model, and the future situation, with the double of parts. The company where the research was developed presents problems of overwork in process and it is foreseen that the problem will be more complicated when increasing the production volume, for this reason, simulation is considered as the ideal tool for the analysis of this problem; specific. Through different experiments in the model, a solution to these problems was observed and the satisfactory production volume of eight hundred and sixty thousand pieces was achieved.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Supply Chain and Operations Resilience (IJSCOR):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com