Improved heuristic algorithm for modern industrial production scheduling Online publication date: Tue, 23-Oct-2018
by Yongqing Jiang; Fucheng Pan
International Journal of Modelling, Identification and Control (IJMIC), Vol. 30, No. 4, 2018
Abstract: Scheduling is one of the core links of modern industrial production. Scheduling needs to be designed according to the characteristics of the production line. In order to optimise the problem of workshop scheduling, the service-oriented programming idea and advanced technology to optimise the system development of mixed flow shop are adopted. The system is designed for applications in a distributed network environment. In this paper, an improved heuristic industrial production scheduling method is proposed to solve the scheduling system problem with multiple scheduling tasks, multiple processes, multiple stations, multiple constraints and rules. This method specifies the processing equipment, start time and completion time for each process of the production task. The application method shows that the proposed method can improve the automation and intelligence level of the scheduling process, improve the utilisation rate of equipment and other production resources, and give full play to the enterprise production capacity.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Modelling, Identification and Control (IJMIC):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com