Title: Function-based scheduling method on initial identified water level of reservoir long-term optimal scheduling
Authors: Cailin Li; Chao Wang; Junchao Li; Qiaoya Liu; Xiaoju Wu; Ping Yang
Addresses: School of Mechanical Electrical Engineering, Guilin University of Electronic Technology, Guangxi Province, China ' Laboratory of Advanced Design, Manufacturing and Reliability, School of Mechanical Engineering, Jiangsu University, Zhenjiang, 212013, China ' Laboratory of Advanced Design, Manufacturing and Reliability, School of Mechanical Engineering, Jiangsu University, Zhenjiang, 212013, China ' Laboratory of Advanced Design, Manufacturing and Reliability, School of Mechanical Engineering, Jiangsu University, Zhenjiang, 212013, China ' Laboratory of Advanced Design, Manufacturing and Reliability, School of Mechanical Engineering, Jiangsu University, Zhenjiang, 212013, China ' Laboratory of Advanced Design, Manufacturing and Reliability, School of Mechanical Engineering, Jiangsu University, Zhenjiang, 212013, China
Abstract: In this paper, a function-based scheduling method combining with statistical analysis of historical runoff data and inflow data is proposed to calculate the initial water level of a reservoir under long-term optimal operation. Two-ary interpolation function and database searching are integrated in the solving process. An example is taken to demonstrate the feasibility and engineering practicability of this method. Initial water level obtained by this method establishes a foundation for making optimal scheduling plans.
Keywords: initial water level; function scheduling; control stage; reservoirs; long-term scheduling; optimal scheduling; runoff data; inflow data.
DOI: 10.1504/IJMSI.2015.075831
International Journal of Materials and Structural Integrity, 2015 Vol.9 No.4, pp.254 - 261
Published online: 07 Apr 2016 *
Full-text access for editors Full-text access for subscribers Purchase this article Comment on this article