A simulation study on CONWIP system design for bicycle chain manufacturing Online publication date: Wed, 01-Dec-2021
by Yu-Hsiu Hung; Kuan-Cheng Huang; Taho Yang
European J. of Industrial Engineering (EJIE), Vol. 16, No. 1, 2022
Abstract: The aim of the study was to demonstrate the effectiveness of constant work-in-process (CONWIP) pull system to bike chain production. Two multi-CONWIP production systems (developed by Kaizen, as well as by looking at the bottlenecks) were proposed to prevent WIP accumulations. Simulation was performed on the average lead time and the total WIP of the two multi-CONWIP systems in comparison with those of a current bike chain production system. Results of the comparisons showed that the Kaizen multi-CONWIP system outperformed all the other systems on the average lead time (with up to 42.8% improvements). The bottleneck multi-CONWIP system were able to reduce the WIP volume by over 50%, outperforming the Kaizen multi-CONWIP system and the current production system. These results show that multi-CONWIP has potential in reducing production lead time and WIP and can better satisfy customer demands. [Received: 18 March 2020; Accepted: 27 January 2021]
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the European J. of Industrial Engineering (EJIE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com