Productivity improvement through balancing process using multi-skilled manpower in apparel industries Online publication date: Sat, 20-Dec-2014
by Rezaul Hasan Shumon; Kazi Arif-Uz-Zaman; Azizur Rahman
International Journal of Industrial and Systems Engineering (IJISE), Vol. 11, No. 1/2, 2012
Abstract: The apparel industries must produce momentous quantities in shorter lead times. Apparel product is highly correlated with high level of productivity; sewing line should be balanced in shorter possible time and effective way for each style and quantity. The focal constraint against the higher productivity is the variation in individual capacity which is the cause of improper line balancing and bottle neck process. This paper is based on an effective layout model where to hit upon the bottleneck process through benchmark capacity and led us to use balancing process using two separate concept of manufacturing processes modular line and traditional system both together. The research shows that this balanced layout model has increased the efficiency by 21%, and labour productivity by 22%.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com