Schedule performance measurement based on statistical process control charts Online publication date: Sat, 17-Jan-2015
by Omogbai Oleghe; Konstantinos Salonitis
International Journal of Engineering Management and Economics (IJEME), Vol. 4, No. 3/4, 2014
Abstract: In a job-shop environment, achieving a schedule that is on target is difficult due to the dynamism of factors affecting the system. In this paper the Shewart's Individuals control chart is applied to a scheduling process for the purpose of measuring schedule performance. The charts are applied to monitor the deviations of actual from scheduled process times for jobs on a process machine. Data transformation operations are used to counter the negative effects of non-normal data. The proposed methodology enables a scheduler study the variations between scheduled and actual outcomes, seek ways of eliminating these variations and check if process improvements have been effective. SPC charts have not been used to measure schedule performance in a job shop setting, so this paper uniquely contributes to research within the field.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Engineering Management and Economics (IJEME):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com