Period of processing for multi-entry and multi-outlet non-blocking serial production line Online publication date: Sat, 12-Aug-2017
by Peng Li; Yuegang Tao; Bingling Cai; Zilong Zhang; Peng Yang
International Journal of Industrial and Systems Engineering (IJISE), Vol. 27, No. 1, 2017
Abstract: The period of processing of multi-entry and multi-outlet serial production line is studied in this paper. The computational algorithms of production periods of multi-entry and multi-outlet serial production line under non-blocking optimal control are given. The algorithms contain the computational algorithms of production periods of single-entry and single-outlet, single-entry and multi-outlet, multi-entry and single-outlet serial production lines, as the special cases. The algorithms based on max-plus algebra are constructive. A numerical example is provided to illustrate the computational algorithms.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Industrial and Systems Engineering (IJISE):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com