Reliability analysis of the main conveyor system in underground coal mine to determine the maintenance schedules
by A.K. Gorai; Pritam Kumar; Ashok Kumar Patel
International Journal of Mining and Mineral Engineering (IJMME), Vol. 8, No. 3, 2017

Abstract: The study aims to analyse the reliability of the main conveyor system in an underground coal mine [Churcha (RO)] in India for estimating the suitable maintenance time. The main conveyor system in the mine has seven subsystems. The present study examined the six common probability distribution functions for fitting the time between failure (TBF) and time to repair (TTR) data. The TBF data in all the cases best fitted with Weibull 3-parameter distribution function except one. But, the TTR data in most of the cases best fitted with Lognormal 3-parameter distribution function. It was found that the subsystems C1, C2, C3, C4, C5, C6 and C7 require maintenance in the interval of 52.39, 65.28, 60.00, 84.66, 98.77, 20.89 and 112.85 h, respectively, to improve the reliability of the system to 80%.

Online publication date: Tue, 15-Aug-2017

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Mining and Mineral Engineering (IJMME):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com