Modelling, simulation and resource optimisation of complex development project by fusion of multiple-domain matrix and coloured Petri nets methods Online publication date: Tue, 05-Feb-2019
by Gordan Topic; Dragan Jevtic
International Journal of Simulation and Process Modelling (IJSPM), Vol. 14, No. 1, 2019
Abstract: In this research, a fusion of two methods is developed as a suitable strategy and procedure for dynamic management of complex project systems: the first method of multiple-domain matrix (MDM) includes modelling complex relations between resources and activities, using rearrangement of these elements to minimise feedbacks. The second method provides an insight into the project system dynamics by performing coloured Petri net (CPN) simulation based on the model of project system obtained by the first method. The focus is on the unique conversion of the MDM method to CPN, where the static system description of the MDM method was expanded by the capabilities of the dynamic system description of the CPN method. The objective was to evaluate an effective technique to analyse a complex project system of software development, which enables detailed planning and optimal management to shorten the production cycle of the appropriate quality with the lowest cost.
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Simulation and Process Modelling (IJSPM):
Login with your Inderscience username and password:
Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.
If you still need assistance, please email subs@inderscience.com